EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
ToddsCH650B
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (92)
Elevator
- (8)
-
Final Assembly
-
AlumiPrep and Alodine
-
Breakdown and Cleaning
-
Installed L's
-
Corrected Mistake
-
Fitting Parts
-
Started Horn
-
Started Assembly
Engine
- (4)
-
Corvair Teardown
-
Corvair Teardown
-
Corvair Teardown
-
Corvair Teardown
Firewall
- (6)
-
Completed
-
Started
-
Assembly
-
Assembly
-
Assembly
-
Started
CabinFloor
- (6)
-
Reassemble
-
Disassemble, Debur,...
-
Final Hole Drilling
-
Rudder Pedals
-
Started
-
Started
H-Stabilizer
- (10)
-
Riveted Top Skin
-
Rivet Top Skin
-
Assembly
-
Priming
-
Deburring and Cleanup
-
Final Drilling
-
Fitting and Drilling...
-
Hinge Fitting
-
Skin fitting
-
Skeleton Assembly
LeftAileron
- (4)
-
Final Assembly
-
Drilling and Priming
-
Assembly
-
Started
LeftWingFlap
- (3)
-
Final Assembly
-
Pilot Drilled and...
-
Pilot Drilled Ribs...
LtRrFuseSide
- (6)
-
Reassemble
-
Disassemble, Debur,...
-
Final Hole Drilling
-
Longerons
-
L's
-
L's
RearFuselage
- (11)
-
Priming
-
Reassemble
-
Disassembly
-
L's
-
Main Gear Channel
-
Fairleads
-
Rudder Cable Fairings
-
Reassemble
-
Longerons
-
Corrected Mistake
-
Started
RearLowrFuse
- (13)
-
Corrected Mistake
-
Corrected Mistake
-
Priming
-
Corrected Mistake
-
Final Assembly
-
Disassembly
-
Final Hole Drilling
-
Z's
-
Lower Rudder Hinge
-
Longerons
-
Z's
-
Assembly
-
Started
RghtWingFlap
- (4)
-
Final Assembly
-
Priming
-
Assembly
-
Drill Ribs
RightAileron
- (3)
-
Completed
-
Assembly
-
Started
RtRrFuseSide
- (6)
-
Final Assembly
-
Drilling
-
Panel Positioning
-
Drilling
-
L's
-
Started
Rudder
- (7)
-
Completed
-
Corrected Mistake
-
Corrosion Protection...
-
Deburring
-
Started nose skin
-
Assembly
-
Tail kit inventory...
None
- (1)
-
Kit Sold
Builder Name:
Todd Osborne
-
Project:
Zenair - CH 650 B
-
VIEW REPORTS
Total Hours:
231
Start/Last Date:
Nov 18, 2017 - Dec 20, 2020
Engine:
Corvair
Propeller:
TBD
Panel:
GlassPack (Custom)
Friendly URL:
https://eaabuilderslog.org?s=ToddsCH650B
Home or Last Project Picture
Mar 17, 2019
L's
- (6 hours)
Category: RearFuselage
Drilled upper cross member, installed new baggage floor supports, and rear and middle bulkheads. Fit and drilled final diagonal L's, and final drilled cross members.
0001.jpg
0002.jpg
0003.jpg
0004.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.